House Wiring Handover Checklist: Photos, Documents and Test Records to Collect From the Electrician

The wiring disappears behind plaster. The record of it should not.

Share

Once the walls are plastered and painted, the wiring of a home cannot be seen again. What remains is paper: the record of what was installed, where it runs and how it tested. Most homeowners receive none of it. This checklist lists what to collect from the electrician or contractor at two points, before the walls are closed and at completion. It applies to new homes and to renovations.

Before the walls are closed

  • Photographs of every wall and ceiling showing the conduit routes and junction boxes, taken with a tape or a known object in the frame. These prevent a drill going through a conduit years later.
  • Photographs of the printing on the wire as installed. On APAR house wires the printing along the wire shows the grade, the size, 1100 V, IS 694 and the BIS licence number.
  • A note of which conduit carries which circuits, and confirmation that no conduit is overfilled. The conduit fill chart gives the limits.
  • A check that power, data and CCTV cables are in separate conduits.

Documents to collect at completion

DocumentWhat it should showWhy it is worth keeping
Wire purchase invoicesBrand, product name and grade, size and quantity for each itemProof of what was bought, and the basis for any later claim
Coil labels or cartonsThe same grade and size as the invoiceConfirms that what was invoiced is what reached the site
Circuit scheduleEach MCB in the distribution board, the rooms and points it feeds, the wire size and the MCB ratingThe single most useful page when a fault or an addition comes up
Distribution board layoutIncoming supply, RCCB and MCB positions, with labels that match the scheduleLets any electrician work on the board safely
Earthing recordLocation of the earth pit or earth connection and the route of the main earth wireEarthing is checked and maintained over the life of the home
Test recordThe readings listed in the next section, with the date and the name of the person who testedA baseline for comparison when the installation is tested again
Appliance circuit listWhich circuits are dedicated to air conditioners, geysers, the kitchen and any EV charger, and their wire sizesShows at once whether a new appliance can be added

Tests to ask for before the supply is switched on

A licensed electrician should carry out these tests and write down the result of each one. The homeowner does not need to interpret the readings, only to hold the record.

  • Insulation resistance of each circuit, measured with an insulation tester between phase, neutral and earth.
  • Earth continuity to every socket and every metal fitting.
  • Polarity, confirming that every switch breaks the phase wire and not the neutral.
  • RCCB operation, using the test button and, where the electrician has the instrument, a trip test.
  • A check that each MCB rating matches the wire size on its circuit. The MCB rating to wire-size chart shows the pairing.

What to do with leftover wire

Short lengths left at the end of the job are worth keeping, labelled by size. They match the installed wire in grade and colour, which helps when a point is added later. Store them in a dry, shaded place away from chemicals.

Where the wire record starts

The record is only as good as the wire line in the original quotation. Where the quotation named the product and grade, for example Shakti FR LSH or Anushakti HR FR LSH, the invoices, the coil labels and the printing on the wire can all be checked against it. The board itself is covered in the distribution board wiring guide.

This checklist is a record-keeping aid. It does not replace inspection and testing by a licensed electrician.