A runway edge light two kilometres from the substation has to burn at exactly the same brightness as the one beside it. That single requirement shapes the whole electrical design of an airfield ground lighting system, and it explains why the cables used on an airfield look nothing like the cables that light a car park or a street.

This article sets out how an airfield lighting circuit is arranged, what each of its three cable types has to do, and what a consultant or contractor should state when specifying them.

The problem with feeding runway lights in parallel

Ordinary lighting is wired in parallel. Every lamp sees the supply voltage, less whatever is lost in the cable on the way. Over a short distance the loss is small and nobody notices. Over the length of a runway and its taxiways it is not small. The lamps at the far end would receive a lower voltage than the lamps near the supply, and they would be visibly dimmer. A pilot reads the pattern and intensity of those lights as guidance, so uneven brightness is not a cosmetic fault.

Airfields solve this by wiring the lights in series. One loop of cable leaves the substation, passes every light position on the circuit and returns. The same current flows through every point in a series loop, so every lamp receives the same current and gives the same output, whatever its distance from the source.

How a series circuit is built

The loop is fed by a constant current regulator, usually shortened to CCR. The regulator holds the loop current at a set value and raises or lowers its output voltage to do so. A current of 6.6 A at full brightness is the common arrangement, with lower current steps giving the dimmer settings that air traffic control selects for the visibility on the day.

The lamps are not connected directly into the loop. Each light is fed through its own small series isolating transformer. The primary winding of the transformer sits in the loop, and the secondary winding feeds the lamp. This does two jobs. It separates the fitting from the loop voltage, and it keeps the loop continuous when a lamp fails, so one failed lamp does not put out the rest of the circuit.

Because the regulator must push the same current through every transformer and every metre of cable, its output voltage rises with the length of the circuit and the number of lights on it. On a long circuit that voltage is measured in kilovolts. This is the reason an airfield lighting loop is cabled with a medium-voltage grade cable even though each lamp is a small load.

Three cables, three duties

APAR’s airport lighting cables page describes the range in the same three groups that the circuit itself falls into: primary, secondary and remote control cables.

CableWhere it runsWhat it has to do
PrimaryBetween the constant current regulator and the series isolating transformers, around the whole loopCarry the loop current at the regulator output voltage, with sound insulation to earth over a long buried route
SecondaryBetween each isolating transformer and its light fittingCarry the lamp current over a short run, in pits and bases that are often wet
Remote controlBetween the control tower and the constant current regulatorsCarry the switching and brightness commands, and the status signals coming back

Primary cable

The primary cable has the most demanding duty on the airfield. APAR manufactures its airfield lighting cables to IS 1554 (Part II) in 5 kV grade. The published range is single core 6 sq mm and single core 16 sq mm in copper, and two core 25 sq mm in aluminium.

The conductor size on a series circuit is not chosen the way a feeder is sized. The current is fixed by the regulator, so the question is not whether the cable can carry it. A larger conductor lowers the resistance of the loop, which lowers the voltage and the power the regulator has to supply for a given number of lights. On long circuits that saving, and the regulator rating it allows, is the usual reason for choosing the larger copper size.

The property that matters most in service is insulation resistance to earth. A primary loop runs for kilometres underground with a connection at every transformer, and each connection is a place where moisture can enter. When the insulation resistance of a circuit falls, current leaks to earth, part of the circuit can dim and the regulator may trip. A large share of the maintenance effort on airfield circuits goes into finding and repairing these low-resistance points, which is why the quality of the cable, the connectors and the jointing matters more here than the copper cross-section.

Secondary cable

The secondary cable is short and works at low voltage, but it lives in the worst place on the airfield: the transformer pit or the base of the fitting, which collects water, fuel residue and grit. It is disturbed every time a fitting is serviced. Flexibility, a tough sheath and a properly matched plug and socket connection decide how long it lasts.

Remote control cable

Remote control cables link the control tower with the regulators. Where the control system uses multicore copper, the selection rules are those of any control circuit: enough cores for every command and indication with spares in hand, and a route that keeps the control cable separated from the power cables in shared trenches. APAR’s LV control cables are a separate product family, offered with 2 to 61 cores, and the airport lighting range has its own remote control cables for this duty.

Armoured or unarmoured

Airfield cables are generally buried, either directly or drawn through ducts. APAR offers an armoured variety for the extra mechanical protection a buried route calls for. The choice follows the route. A cable drawn into a continuous duct system is protected by the duct. A cable laid directly in the ground, or crossing an area where later excavation is likely, is the case for armour. The reasoning is the same as for any buried power cable and is set out in the cable armouring guide. Trench depth, bedding and protection tiles are covered in the underground cable laying guide.

Project specifications also differ on whether the primary cable should carry a metallic screen. Both screened and unscreened designs are in use, and the airport’s own specification governs. It should be confirmed before the enquiry is sent, because it changes the cable construction and the connector kits.

What to state in the specification

APAR recommends that an airfield lighting cable enquiry states the following for each circuit, not for the project as a whole.

  • The cable duty: primary, secondary or remote control.
  • The voltage grade and the standard. For the APAR primary range this is 5 kV grade to IS 1554 (Part II).
  • Conductor material and size, taken from the regulator and circuit design.
  • Screened or unscreened, and armoured or unarmoured, by route.
  • Drum lengths planned around the transformer pit positions, so that joints fall inside pits and not between them.
  • The insulation resistance test to be carried out and recorded on each drum length after laying and on the completed loop before energising.

The last point deserves attention on site. A reading taken on every section as it is laid gives the airport a baseline for each circuit. Years later, when a circuit starts to lose insulation resistance, that baseline is what tells the maintenance team how far the circuit has drifted and where to look. The general sequence for pre-commissioning tests is given in the site testing checklist before energising a power cable.

For cable selection on a specific airfield project, the circuit schedule and the governing airport specification can be sent to the APAR technical team through the contact page.